New School Progress

Second classroom block construction- one month

Preparation for corridor on first floor

Preparation of steel work for second level corridor

About admin

Valerio was onsite volunteer in 2010. Created the website when in COH. Hosting admin and site technical admin since then. Content is directly managed by the Sisters at City Of Hope.
This entry was posted in News. Bookmark the permalink.

Leave a Reply